Projects are executed with integrated technical teams, not isolated workstreams.
This helps preserve design intent and reduce late-stage friction between packages and stakeholders.
Our portfolio reflects the kind of work VEC is known for: multidisciplinary engineering for complex energy challenges, delivered with practical execution awareness and a strong understanding of local operating environments.
This helps preserve design intent and reduce late-stage friction between packages and stakeholders.
That approach keeps the work grounded in client outcomes rather than document production alone.
Re-Front-End Engineering Design phase (Re-FEED) plus Detailed Design (DD) was carried out for Water Treatment Facilities Upgrade Project. The objective of this project is to install new produced water treatment facilities which includes, Induced Gas Flotation (IGF) and Nutshell filters (NSF) with their backwash system at B Block station.
Detailed design and Engineering to remove the condensate outlet spools of Shuaibah Bulk Separator (V-6701) which has dead legs (extra piping due to removal of condensate pumps P-6701A/B/C) and install new piping spool with shorter lengths and less diversions.
To carryout Basis for Design (BFD) by extension of BRNW RMS-5 for 6 slots, Replacement of 69-RO-2039 on Test Separator, Replacement of V-6201 liquid control valve, Replacement of V-6201 liquid flowmeter and Replacement of V-6201 BS &W meter 62-QI-131
Detailed Design and Engineering for Firewater System in Gas Processing Plant (GPP) Phase 2 (SAF-114) by ensuring that the FW system is designed to meet the CDAA and NFPA standards.
Detailed Design and Engineering services for OQEP Produced Water Disposal Network Expansion via additional 24” CS+PERT Pipeline sub-headers and 10” CS+PERT Flowlines for PWD 4 wells, along with optimizing the Water disposal wells on plot layout.
This project maximized gas and condensate availability by rerouting SNMG and Shuaiba production, improving flexibility and reducing dependency on the SN Shuaiba compressor.
FEED was carried out to bypass the existing flash gas compressors and route flash gases to SRDC-2 through a new flash gas ejector
The engineering covered two 400/220kV grid stations with 750MVA transformers, among the first 400kV projects designed and constructed in Oman.
The scope included design review, tender support, factory inspection, and supervision of construction, installation, testing, and commissioning for the proposed grid stations and facilities.
Objective of this study is to determine revalidate PSBR-8 (Avoid Brittle Fracture of Metallic Materials for Fahud, Yibal, QA, Yibal-Khuff and LPS) Read More →
Analysis of the governing scenarios for existing HP Flare System using design loads. Evaluation of options for reducing the operating pressure of the unloading …. Read More →
Prepared the Basis for Design for Birba Rationalization Project including the following sub-projects: Birba Law Pressure Operation; Kaukab Development; Birba lnfill Drilling; Birba Flaring Reduction; Birba Rejuvenation; Sour Gas Network.
Conduct a detailed review of the GD Flowline and Gas Gathering Network Optimization Study for Saih Rawi Cluster…Read More →
The constraint analysis scope included data gathering, site visits, assessment, testing and rating of existing facility to identify the bottlenecks of the facility…Read More →
Produced water at the Marmul Polymer Plant was starting to show polymer breakthrough…Read More →
VEC is executing Detailed Design (DD) and AFC engineering for modular Hook-up …Read More →
The DD project consisted of constructing a new 33kV / 0.433kV substation building at Safah adjacent…Read More →
The DD project scope is to study and design the pipeline for the delivery…Read More →
The project objective is to install additional F&G Detectors at Saiwan facility and integrate the same to existing Fire & Gas Control and Detection system.
The project Scope includes laying of a new 16” production header from Safah South Wedge ‘E’ new manifolds to a tie in point upstream of Remote Manifold – 5 & a new 12” water injection header from existing header in SSWC to SSWE.
Front End Engineering (FEED) and Detailed Design (DD) was carried out for one number of fixed speed centrifugal pump package along with associated auxiliary systems for 22500 m3/day. It also included Installation of new 30” underground 1.1 km 150# GRE header along with flushing connections (pits) in parallel to existing 24” GRE header.
VEC received the first PDO ICV award in the Omanisation and Training category for its Hire Develop Deploy program, reinforcing the company’s commitment to developing Omani engineering talent.
Our client base includes operators, developers, and utilities who rely on VEC for engineering, design, and project delivery assistance.





Rather than a one-size-fits-all project model, VEC’s experience tends to cluster around a few recurring delivery themes.
Projects where uptime, safe access, tie-ins, and phased delivery all shape the engineering response.
Assignments where strong concept framing and FEED work reduce uncertainty before execution begins.
Programs that demand technical depth as well as disciplined alignment between teams and stakeholders.
We can help frame the right technical approach for brownfield upgrades, new developments, or infrastructure-related engineering work.