Projects built around measurable delivery

Our portfolio reflects the kind of work VEC is known for: multidisciplinary engineering for complex energy challenges, delivered with practical execution awareness and a strong understanding of local operating environments.

A portfolio shaped by technical complexity and real asset needs.

  • Project examples below reflect the type of work VEC supports across Oil & Gas and Energy & Infrastructure.
  • Each engagement demands a different mix of engineering depth, interface management, and delivery coordination.
  • Some assignments require faster brownfield turnaround and practical execution planning.
  • Others require deeper upfront definition and close alignment between multiple disciplines and stakeholders.
Multidisciplinary Delivery

Projects are executed with integrated technical teams, not isolated workstreams.

This helps preserve design intent and reduce late-stage friction between packages and stakeholders.

Outcome Focused

Every assignment is shaped around asset performance, operability, and execution reality.

That approach keeps the work grounded in client outcomes rather than document production alone.

Oil & Gas

DALEEL PETROLEUM

Daleel Water Treatment Facility Upgrade

Re-Front-End Engineering Design phase (Re-FEED) plus Detailed Design (DD) was carried out for Water Treatment Facilities Upgrade Project. The objective of this project is to install new produced water treatment facilities which includes, Induced Gas Flotation (IGF) and Nutshell filters (NSF) with their backwash system at B Block station.

  • Re-FEED
  • Upgrade
  • Treatment
  • Filtration
  • Integration
Petroleum Development Oman (PDO)

FCP-Shuaibah Bulk Separator

Detailed design and Engineering to remove the condensate outlet spools of Shuaibah Bulk Separator (V-6701) which has dead legs (extra piping due to removal of condensate pumps P-6701A/B/C) and install new piping spool with shorter lengths and less diversions.

  • Removal
  • Optimization
  • Modification
  • Installation
  • Efficiency
Petroleum Development Oman (PDO)

RMS – Burhan West Extn. Phase-2

To carryout Basis for Design (BFD) by extension of BRNW RMS-5 for 6 slots, Replacement of 69-RO-2039 on Test Separator, Replacement of V-6201 liquid control valve, Replacement of V-6201 liquid flowmeter and Replacement of V-6201 BS &W meter 62-QI-131

  • BFD
  • Extension
  • Upgrades
  • Replacement
  • Instrumentation
OQ Exploration and Production

FW System in GPP Phase 2_DD_SAF – 114

Detailed Design and Engineering for Firewater System in Gas Processing Plant (GPP) Phase 2 (SAF-114) by ensuring that the FW system is designed to meet the CDAA and NFPA standards.

  • Design
  • Engineering
  • Compliance
  • Safety
  • Standards
OQ Exploration and Production

PW Disposal Network Expansion-Phase II-DD-SAF 120

Detailed Design and Engineering services for OQEP Produced Water Disposal Network Expansion via additional 24” CS+PERT Pipeline sub-headers and 10” CS+PERT Flowlines for PWD 4 wells, along with optimizing the Water disposal wells on plot layout.

  • Engineering
  • Expansion
  • Integration
  • Optimization
  • Planning
Petroleum Development Oman (PDO)

SNMG Shuaiba Re-routing to SNDC

This project maximized gas and condensate availability by rerouting SNMG and Shuaiba production, improving flexibility and reducing dependency on the SN Shuaiba compressor.

  • Availability
  • Rerouting
  • Flexibility
  • Optimization
Petroleum Development Oman (PDO)

SRCPP Flash Gas Compressor Bypass – FEED

FEED was carried out to bypass the existing flash gas compressors and route flash gases to SRDC-2 through a new flash gas ejector

  • Bypass
  • Routing
  • Ejection
  • Integration
Design and Construction of Two New 400/220kV Grid Stations at Sur IPP and Jahloo
Toshiba Transmission & Distribution Systems Gulf (SPC)

Design and Construction of Two New 400/220kV Grid Stations at Sur IPP and Jahloo

The engineering covered two 400/220kV grid stations with 750MVA transformers, among the first 400kV projects designed and constructed in Oman.

  • Grid stations
  • 400kV systems
  • Power infrastructure
Owner's Engineer Services for Amerat and Mabella 132/33kV Grid Stations of OETC
Oman Electricity and Transmission Company (OETC)

Owner’s Engineer Services for Amerat and Mabella 132/33kV Grid Stations of OETC

The scope included design review, tender support, factory inspection, and supervision of construction, installation, testing, and commissioning for the proposed grid stations and facilities.

  • Owner's engineer
  • 132/33kV stations
  • Commissioning support
Petroleum Development Oman (PDO)

PSBR-8 revalidation for North asset

 Objective of this study is to determine revalidate PSBR-8 (Avoid Brittle Fracture of Metallic Materials for Fahud, Yibal, QA, Yibal-Khuff and LPS) Read More →

  • Emergency
  • Depressuring
Petroleum Development Oman (PDO)

Al Noor Flare Mitigation Study

Analysis of the governing scenarios for existing HP Flare System using design loads. Evaluation of options for reducing the operating pressure of the unloading …. Read More →

  • Flare analysis
  • Pressure control
  • Blowdown study
  • Mitigation plan
  • Safety review
Petroleum Development Oman (PDO)

Birba Rationalisation Project, Design Engineering

Prepared the Basis for Design for Birba Rationalization Project including the following sub-projects: Birba Law Pressure Operation; Kaukab Development; Birba lnfill Drilling; Birba Flaring Reduction; Birba Rejuvenation; Sour Gas Network.

  • Design basis
  • Birba project
  • LP operation
  • Flaring reduction
  • Sour gas
Petroleum Development Oman (PDO)

Saih Rawl GD Flowline and Gas Gathering Network Optimization,Detailed Engineering

Conduct a detailed review of the GD Flowline and Gas Gathering Network Optimization Study for Saih Rawi Cluster…Read More →

  • Constraints
  • Bottlenecks
  • Testing
  • Execution
Petroleum Development Oman (PDO)

Mabrouk Debottlenecking Process Study

The constraint analysis scope included data gathering, site visits, assessment, testing and rating of existing facility to identify the bottlenecks of the facility…Read More →

  • Constraints
  • Assessment
  • Testing
  • Bottlenecks
  • Execution
Petroleum Development Oman (PDO)

Marmul Stage – 5 EPC & Operations, EPC

Produced water at the Marmul Polymer Plant was starting to show polymer breakthrough…Read More →

  • Produced water
  • Polymer trials
  • IGF testing
  • NSF testing
  • Engineering
Petroleum Development Oman (PDO)

Engineering and Supply of Gas Hook Up Modular Skids – Batch 1- 50 SKIDS (20 MP & 30 HP) and Engineering and Supply of Gas Hook Up Modular Skids – Batch 2- 25SKIDS (5 MP & 20 HP)

VEC is executing Detailed Design (DD) and AFC engineering for modular Hook-up …Read More →

  • Detailed design
  • AFC engineering
  • Gas skids
Occidental Petroleum Corporation

OXY OMN Safah NEW 33kV Substation Upgrade

The DD project consisted of constructing a new 33kV / 0.433kV substation building at Safah adjacent…Read More →

  • DD engineering
  • AFC design
  • Gas skids
  • 3D models
Occidental Petroleum Corporation

OXY Mukhaizna Wetland Project

The DD project scope is to study and design the pipeline for the delivery…Read More →

  • Engineering
  • Design
  • Skids
  • Modelling
  • Execution
CC Energy Development

Detail design for extension of F&G design at Saiwan

The project objective is to install additional F&G Detectors at Saiwan facility and integrate the same to existing Fire & Gas Control and Detection system.

  • F&G upgrade
  • Detectors
  • Integration
  • Safety
Occidental Petroleum Corporation

OXY OMN SSWE Development

The project Scope includes laying of a new 16” production header from Safah South Wedge ‘E’ new manifolds to a tie in point upstream of Remote Manifold – 5 & a new 12” water injection header from existing header in SSWC to SSWE.

  • Production header
  • Water injection
  • Pipeline routing
  • Manifold tie-in
  • SSWE upgrade
Petroleum Development Oman (PDO)

LPS Additional Water Injection Pump

Front End Engineering (FEED) and Detailed Design (DD) was carried out for one number of fixed speed centrifugal pump package along with associated auxiliary systems for 22500 m3/day. It also included Installation of new 30” underground 1.1 km 150# GRE header along with flushing connections (pits) in parallel to existing 24” GRE header.

  • Design
  • Pumping
  • Integration
  • Capacity
  • Installation
  • Expansion

Recognition earned through delivery and local capability.

PDO ICV Award

Recognized for Omanisation and training impact.

VEC received the first PDO ICV award in the Omanisation and Training category for its Hire Develop Deploy program, reinforcing the company’s commitment to developing Omani engineering talent.

  • Focused on people development and practical capability building.
  • Aligned with long-term in-country value outcomes for the sector.
Trusted By Leading Clients

Relationships built through technical confidence and dependable support.

Our client base includes operators, developers, and utilities who rely on VEC for engineering, design, and project delivery assistance.

PDO
OXY
OQ
Daleel
CC Energy Development

Themes that define our project work.

Rather than a one-size-fits-all project model, VEC’s experience tends to cluster around a few recurring delivery themes.

Brownfield Improvement

Fast-cycle engineering around operating assets.

Projects where uptime, safe access, tie-ins, and phased delivery all shape the engineering response.

Early Definition

Turning project intent into decision-ready packages.

Assignments where strong concept framing and FEED work reduce uncertainty before execution begins.

Integrated Delivery

Multidiscipline coordination across energy infrastructure scope.

Programs that demand technical depth as well as disciplined alignment between teams and stakeholders.

Need Relevant Experience?

Share your project brief and we can align examples that best match your needs.

We can help frame the right technical approach for brownfield upgrades, new developments, or infrastructure-related engineering work.